Jean-Yves’ Pool
Another hot day, the deck is installed
Under another extremely hot day (the temperature reached over 37.4 degrees) work has continued. All the structure and joists were completed on the previous day.
The merbau deck wood has been sorted and laid on top.
Friday, 5 January 2007
Stephen doesn’t seem to mind the heat. I do :(
Inspection des travaux finis
inspected finished work :)
Next
Previous